Wards
Karen ward plan: finish the health centre, fix Hardy market, drain the lanes
The Karen manifesto puts two incomplete county projects first, then water security, drainage and a community forest economy.
Karen is the largest ward in Lang'ata by land and the smallest by population. Its problems are spread out, expensive to reach and easy to postpone. The ward manifesto published by the Antony Muriithi Githiomi campaign treats that geography as a delivery problem, not an excuse.
The first commitment is completion. County project records have listed the medical block at Karen Health Centre and the modern kiosks and toilet block at Hardy shopping centre as incomplete, with reported contract values of about KES 22.5 million and KES 17 million respectively. The ward plan proposes a published completion timetable, a staffing and equipment plan before the health block opens, and a transparent stall allocation process for Hardy and Karen market.
The campaign argues that a finished building is not a finished service. Its proposals include water, waste collection, lighting and public toilets at both trading points, plus a stocked pharmacy and extended service hours at the health centre.
The second commitment is water. Karen sits close to the Western Nairobi water and sewerage programme, which includes a new reservoir and a large sewer reticulation network. The ward plan asks for a published connection plan linking each estate and trading centre to the new infrastructure, leak repairs before billing increases, water-quality testing for boreholes and vendors, and protection of the riparian corridors that recharge the ward's supply.
The third commitment is drainage. A national roads tender has already identified drainage improvement and outfall works in the Karen and Lang'ata area, including Forest Lane, Lamwia, Twiga Hill, Milima, Grevellia Close, Maasai, Kongoni and Kuro roads. The ward plan proposes to track those works publicly, complete desilting before each rainy season, add footpaths and lighting to the same contracts, and require contractors to reinstate every road they cut.
The fourth commitment is the ward's green economy. Karen's forest edges and proximity to the national park support tourism and hospitality, but public green space is under pressure from dumping and encroachment. The plan proposes community tree nurseries, scheduled estate waste collection, training and licensing for local guides, and a published register of public green spaces.
The campaign frames these as linked commitments rather than separate promises. Better drainage protects the water supply. A working market reduces roadside trading. A maintained forest edge supports paid local work.
The full Karen plan, including proposed actions and intended outcomes, is published on the campaign website under ward manifestos. The campaign invites Karen residents to identify streets or facilities the plan has missed.
This is a campaign communication. It describes proposals and cites publicly reported project records; it does not claim that the candidate has delivered these projects.