Leadership through accountabilityPeople-centred representationEquity and inclusivityIntegrity and responsible stewardshipCollaboration over institutional conflictMeasurable performance#AntoNiTick#LangataNiHome
← All updates

Wards

Nyayo Highrise plan: water that climbs, sewers that work, lights that stay on

Published · 364 words · about 2 min read

In Lang'ata's densest ward, the manifesto prioritises water pressure and storage, sewer extensions, safe lighting and the stalled Joash Olum ECDE centre.

Dense apartment blocks with rooftop water tanks and a clean courtyard — illustration for the Nyayo Highrise ward manifesto
Illustrative image generated for this campaign update. No individuals are depicted.

Nyayo Highrise is the smallest ward in Lang'ata by area and one of the most densely settled anywhere in Nairobi. The ward manifesto published by the Antony Muriithi Githiomi campaign is built around the infrastructure that fails first when people live stacked on top of one another.

Water comes first. A county assembly committee report on the ward documented low pressure, rationing and reliance on vendors, and residents still describe supply that cannot reach upper floors. The campaign proposes a published water audit covering pressure zones, leaks and storage capacity, communal storage tanks and booster capacity for high-rise blocks, water-quality testing for vendors and tankers, and a metering and billing complaints desk with resolution timelines.

Sewerage comes second. The same committee report found zones without sewer lines and ablution blocks filling faster than they could be emptied. The ward plan proposes a served/unserved map, extension of the sewer network to the unserved zones, completion and maintenance of the Joash Olum connection, scheduled emptying and cleaning of public sanitation, and enforcement against illegal discharge into open drains.

Lighting and safe shared space come third. Public project records reported the Undugu-Andolo Road lighting works as only partly complete in 2026. The plan proposes to complete and maintain those lights, light estate stairwells and access lanes with estate management, audit and cover open trenches, culverts and manholes, and revive a ward security forum that includes police, estate committees and youth groups.

The fourth commitment is the stalled Joash Olum ECDE centre. The campaign proposes a published completion date and outstanding works list, proper equipping with furniture, learning materials, water and toilets, and a youth skills room with computers, internet and evening study hours.

The campaign argues that density is not the problem. Unmanaged density is. A ward of half a square kilometre can work well if water, waste, lighting and shared space are planned at the same scale as the buildings.

The full plan, including proposed actions and intended outcomes, is published on the campaign website. Residents can send additional priorities through the contact page.

This is a campaign communication. It describes proposals and references publicly reported committee and project records; it does not claim completed delivery.

Read the plans

Lang'ata's constituency and ward manifestos

Every ward has its own plan, and every plan is published as a proposal with named actions and intended outcomes.