Leadership through accountabilityPeople-centred representationEquity and inclusivityIntegrity and responsible stewardshipCollaboration over institutional conflictMeasurable performance#AntoNiTick#LangataNiHome

Ward manifesto · Karen

Finish the projects residents were promised, and protect the green backbone that makes Karen work.

Karen is the largest ward in Lang'ata by land, with the smallest population spread across big plots, private schools, equestrian land, forest edges and a handful of busy trading points. Its problems are not abstract: a stalled health-centre block, incomplete market works, long-maturing water and sewer investments, and roads that fail when the long rains come.

Commitments
4
Ward area
48 km²
Registered voters
34,450
2022 register
Finish stalled projectsWater and sewerDrainage and roadsForest and livelihoods

Karen · Hardy · Bogani · Ololua · Lang'ata South · Ngong Road corridor

Karen · commitment 01

Finish the Karen Health Centre block and make Hardy market work

The health block and the Hardy kiosks have been sitting incomplete while residents travel for basic services.

We will push the county to complete the stalled medical block at Karen Health Centre and to finish the modern kiosks and toilet block at Hardy shopping centre. Completion is only the start: a finished building must be staffed, stocked, powered and open at hours that match how Karen residents actually travel to work.

Proposed actions (4)
  • Publish a completion timetable for the Karen Health Centre medical block and the Hardy kiosk and toilet works.
  • Require staffing, equipment and a stocked pharmacy before the health block is declared open.
  • Allocate stalls at Hardy and Karen market through a transparent, published list, with priority for local traders.
  • Add water, waste collection, lighting and public toilets to both trading points.

Intended outcomes

Residents get a working health facility close to home, and small traders get secure, serviced spaces instead of roadside pitches.

Ward: Karen · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Karen · commitment 02

Turn the new water investment into water in Karen taps

Karen sits close to major new water infrastructure but households still ration and buy from tankers.

The Western Nairobi water and sewerage programme brings a new reservoir and kilometres of reticulation into the Karen area. We will make sure the ward gets connected, metered and served fairly, and that boreholes, vendors and tanker water are checked so residents know what they are drinking.

Proposed actions (4)
  • Map every Karen estate and trading centre against the new reservoir and reticulation lines, and publish the connection plan.
  • Replace leaking lines and illegal connections before asking residents to pay for losses.
  • Support regular water-quality testing for boreholes and vendors, with results posted publicly.
  • Protect the riparian corridors and wellfields that recharge the ward's water.

Intended outcomes

Fewer dry days and lower water bills, with a clear public record of where the ward's water comes from and how it is protected.

Ward: Karen · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Karen · commitment 03

Drain the lanes before the rains arrive

The drainage works already mapped for Karen and Lang'ata must be completed, not left half-dug.

Several Karen roads are in the county and national drainage programme, including Forest Lane, Lamwia, Twiga Hill, Milima, Maasai, Kongoni and Kuro roads. We will track those works publicly, insist on outfall drains that actually discharge, and pair them with walkable footpaths and lighting so residents are not forced onto the carriageway.

Proposed actions (4)
  • Publish a ward drainage map showing every planned, ongoing and completed line and its outfall.
  • Complete desilting and repairs before each rainy season, with photo evidence at ward level.
  • Add cabro footpaths, crossings and street lighting to the same contracts.
  • Hold contractors to reinstatement: no road should be left broken after pipes are laid.

Intended outcomes

Roads that remain passable through the long rains, fewer flooded compounds, and safer walking routes to schools and shops.

Ward: Karen · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Karen · commitment 04

Protect the forest edge and grow green livelihoods

Karen's trees, open land and wildlife corridor are an economic asset, not empty space waiting to be built on.

Ololua forest, the Ngong Road forest edge and the proximity to the national park give Karen a genuine environmental advantage. We will support community nurseries, refuse collection and visitor services that create paid work for residents, while resisting illegal allocation and dumping on public green space.

Proposed actions (4)
  • Support community tree nurseries and a ward-wide planting programme on public land and school grounds.
  • Introduce scheduled waste collection for estates and trading centres, with a public complaints line.
  • Train and license local guides and hospitality workers for the forest and park gateway economy.
  • Publish a register of public green spaces and act on illegal dumping and encroachment.

Intended outcomes

Cleaner public spaces, paid local work in conservation and tourism, and a written record of what public land exists and who is responsible for it.

Ward: Karen · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Ward by ward

Every ward has a plan. Compare them.

The constituency manifesto sets the shared standards. These ward plans set the local priorities. Read the other four and tell us what your street still needs.