Leadership through accountabilityPeople-centred representationEquity and inclusivityIntegrity and responsible stewardshipCollaboration over institutional conflictMeasurable performance#AntoNiTick#LangataNiHome

Ward manifesto · Nyayo Highrise

The densest ward in the constituency needs water that climbs, sewers that work and lights that stay on.

Nyayo Highrise is barely half a square kilometre but carries more than twenty thousand voters in stacked estates. Pressure, sanitation and shared space are daily problems: water that will not reach upper floors, sewer lines that stop short of whole zones, stalled lighting and an unfinished ECDE centre.

Commitments
4
Ward area
0.4 km²
Registered voters
21,800
2022 register
Water pressureSewerageLighting and securityECDE and youth

Highrise Estate · Undugu · Joash Olum · Kibera access · Kibwezi Road

Nyayo Highrise · commitment 01

Get water to the top floor

Low pressure and rationing force residents to buy expensive water from vendors and tankers.

We will audit the ward's supply, storage and metering, then push for the pressure, tank and pipe upgrades that make upper-floor supply possible. Vendor water will be tested and priced transparently, and leak repairs will be prioritised over new connections.

Proposed actions (4)
  • Publish a ward water audit covering pressure zones, leaks and storage capacity.
  • Install and repair communal storage tanks and booster capacity for high-rise blocks.
  • Test vendor and tanker water and publish the results.
  • Set up a metering and billing complaints desk with resolution timelines.

Intended outcomes

More reliable supply to upper floors and a fairer, safer water market for tenants.

Ward: Nyayo Highrise · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Nyayo Highrise · commitment 02

Connect every block to a working sewer

Zones without sewer lines rely on ablution blocks that fill faster than they can be emptied.

We will extend the sewer network to the unserved zones, complete and maintain the Joash Olum connection, and put the ward's public sanitation on a scheduled emptying and cleaning programme. Overflowing facilities are a health emergency, not a maintenance nuisance.

Proposed actions (4)
  • Map served and unserved blocks and publish the sewer extension route.
  • Extend the sewer line to Zone B and D and complete the Joash Olum connection.
  • Schedule desilting and exhaustor services for public ablution blocks.
  • Enforce against illegal discharge into open drains.

Intended outcomes

Fewer overflows and bad smells, lower disease risk, and sanitation that keeps pace with the ward's density.

Ward: Nyayo Highrise · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Nyayo Highrise · commitment 03

Light every staircase, alley and access road

Dark shared spaces make women, children and workers easy targets and hide dangerous open trenches.

We will complete the stalled Undugu-Andolo lighting, light the estate's stairwells and access lanes, and fix open trenches and missing covers. Lighting will be paired with a functioning local security forum and clear emergency contacts.

Proposed actions (4)
  • Complete and maintain street lighting on Undugu-Andolo Road and estate access lanes.
  • Audit and cover open trenches, culverts and manholes.
  • Install lighting in shared stairwells and courtyards with the estate management.
  • Revive a ward security forum with police, estate committees and youth groups.

Intended outcomes

Safer walking at night, fewer trench accidents, and a security conversation that includes residents instead of excluding them.

Ward: Nyayo Highrise · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Nyayo Highrise · commitment 04

Finish Joash Olum ECDE and open a youth skills room

A stalled classroom and a missing youth space cost the ward's children and school leavers every year.

We will push the stalled Joash Olum ECDE centre to completion and equip it properly, then establish a small youth skills and study room in the ward. For a ward this dense, public indoor space is essential infrastructure.

Proposed actions (4)
  • Publish a completion date and outstanding works list for the Joash Olum ECDE centre.
  • Equip classrooms with furniture, learning materials, water and toilets.
  • Open a youth skills room with computers, internet and evening study hours.
  • Run ward-level bursary and TVET application clinics each term.

Intended outcomes

A finished ECDE centre, a place for young people to study and train, and fewer idle school leavers.

Ward: Nyayo Highrise · Lang'ata Constituency

Proposal for public review. Subject to campaign approval, budget and county/national coordination.

Ward by ward

Every ward has a plan. Compare them.

The constituency manifesto sets the shared standards. These ward plans set the local priorities. Read the other four and tell us what your street still needs.